Long Lake Reconstruction Long Lake Reconstruction
ROADWAY DESIGN // Long Lake Road Reconstruction

Reconstruction of 2.8 km of Long Lake Road (Carnaby to Dequindre Road) for two lanes to five lanes.  The project includes relocating approximately 2 km of 300 mm and 400 mm water main, extension of a large capacity master storm sewer and the replacement of a 30 m long x 10 m wide County drain crossing.  In compliance with the City's Master sidewalk plan, a sidewalk and a safety path were constructed the entire length of the project.

HRC responsibilities included:

  • Topographic Survey
  • Preparation of Legal Documents
  • MDEQ Permit Application
  • Hydraulic Study
  • Scour Analysis
  • Construction Plans and Specifications
  • Construction Staging and Traffic Control
  • Pavement Markings
  • Utility Coordination
  • Structure Design
  • Construction Administration, Inspection, Layout and Testing

The project was funded through MDOT and FHWA.

Construction Engineering and Testing
Construction included storm drain work in adjacent City of Sterling Heights, a crossing of an existing DWSD Transmission Watermain and the installation of a new box culvert crossing.


Client
City of Troy

Location
Troy, MI

Awards
2004 Urban Arterial > 30,000 sq. yds. - Michigan Concrete Pavement Association